USGBC LEED, Materials & Resources, Section 5.1 and 5.2 provide the guidelines for the 500 mile minimum requirement. The guidelines expand beyond the location of the manufacturer to include where the materials were extracted and processed. Most architects agree that this is the most difficult credit to achieve due to the nature of the global economy.